EV charger installation

A home chargepoint on its own circuit from the consumer unit, with load management so the house and the car stay within the main fuse, protection against a PEN fault, and a cable sized for the length of the run. For homes in Sandhurst, Camberley, Bracknell and Ascot.

  • Service 06 / 09
  • Certificate EIC
  • Part P Notifiable
  • Circuit Dedicated
01

What a home charger needs

A car charges for hours at a steady, heavy load. A 7 kW charger draws about 32 amps for as long as the car wants it: close to what an electric shower draws, but all night instead of ten minutes. So a chargepoint gets a dedicated circuit of its own from the consumer unit, never a spur off the sockets.

That circuit needs 30 mA RCD protection of a type suited to a car charger, and the board it comes from needs a spare way to take it. If your consumer unit is an old one with no space or no RCD protection, it may need replacing first, and the quote will say so.

02

What we need to see first

The survey can start with photos. Send these on WhatsApp:

  • The consumer unit, with its door open so the switches and labels show. Leave the cover on.
  • The meter and the cut-out beside it: the sealed box the supply cable comes into, which holds the main fuse. It belongs to the network operator, so photograph it and leave it alone.
  • The drive, the wall where you would like the charger, and where the car usually parks.
  • The route between them, if the board is at the other end of the house from the drive.

From those we can see whether the supply has room for a charger, roughly how the cable would run and what to check on the visit. Then you get a written quote.

03

Load management

Every house has a main fuse in the cut-out, commonly 60, 80 or 100 amps. A charger running flat out on top of the oven, the shower and the kettle can ask for more than that.

Load management stops that happening. A CT clamp, a small sensor that clips round the meter tail, measures what the house is drawing, and the charger turns its own rate down while the house is busy and back up when it is not. The car charges a little slower at teatime, and the total stays within the main fuse.

Many chargers have load management built in. The clamp goes on at the meter and is wired or paired to the charger.

04

PEN fault protection

On most UK supplies, the neutral and the earth share one conductor in the street, the PEN conductor, and the earth in your house is connected to it. If that conductor ever breaks, the earth in the house can rise to a dangerous voltage. Inside, bonding keeps everything you can touch at the same voltage. Outside, a car standing on the drive is a different matter, because you are standing on the ground.

So a chargepoint needs protection against a lost PEN conductor. In most chargers sold now it is built in: the charger watches the supply and disconnects the car if it sees the signs of a PEN fault. Where it is not, another arrangement is needed, such as an earth rod for the charger alone, and the quote sets out which applies.

05

The cable route and the cable size

Outside, the cable is normally steel wire armoured (SWA): a tough black cable with a layer of steel wires under its sheath. It leaves the house through a sleeved hole in the wall and is clipped along it. Where it has to cross the drive it goes in a duct underneath, with warning tape above, so it is protected and can be found later.

On a short run, the cable size is set by the current the charger draws. On a long one it is set by voltage drop: the longer the cable, the more voltage is lost along it, and a thicker cable loses less. A charger at the far end of a long drive, or on a garage across the garden, can need a noticeably bigger cable than one on the wall beside the meter. We measure the route and size the cable for it.

Inside Meter and board

At the house: meter, consumer unit and load managementThe supply cut-out and meter, with brown and blue meter tails running to a steel consumer unit. A CT clamp sits round the brown line tail to measure what the house is drawing, and its lead runs out with the charger cable. A new RCBO way in the consumer unit feeds an armoured cable that leaves through a sleeve in the outside wall. The green and yellow main earth runs from the cut-out to the board. OUT IN kWh MAIN B6 B6 B32 B32 EV TO DRIVE A B C D E F
  1. ACut-out and main fuse. The network operator’s. Its rating sets how much the house can draw.
  2. BMeter.
  3. CCT clamp on the line meter tail. It measures what the house is drawing, for load management.
  4. DA new RCBO way in the consumer unit, for the charger only.
  5. EArmoured cable out through a sleeve in the wall, with the clamp’s lead alongside.
  6. FMain earth. On most supplies it connects to the PEN conductor in the street, which is why the charger needs PEN fault protection.

Outside The run to the drive

Out to the drive: the cable route to the chargerSide view of the drive. The black armoured cable comes out of the house wall, is clipped down it, runs in a duct under the block paving with warning tape above, and rises up the garage wall to a wall charger. A tethered lead runs from the charger to the charge port on the front of the car parked beside it. A dimension line marks the length of the run. THE RUN G H J K L
  1. GArmoured cable clipped down the outside wall.
  2. HDuct under the drive, with warning tape above it.
  3. JWall charger beside where the car parks, with PEN fault protection built in.
  4. KTethered lead to the car’s charge port.
  5. LThe run. On a long one, voltage drop sets the cable size.
Fig. 1A home chargepoint, from the meter to the car. An example layout, not to scale: every route is planned around the house and the drive.
06

Tethered or untethered

A tethered charger has its lead fixed on. You unhook it from the holster and plug it into the car, and the lead lives on the wall. An untethered charger has a socket, and you use the lead that came with the car or one you buy. It looks tidier on the wall and lets you choose the length of lead, but the lead comes out of the boot every time.

Either way, check the length against where the charge port is on your car and how you park. A lead that only just reaches is a nuisance every day.

07

Where to mount it

  • Close to where the car parks, on the side its charge port is on, so the lead does not trail across a path or a doorway.
  • At a comfortable height, clear of car doors and the bins.
  • Where its app can reach your Wi-Fi, or a mobile signal, if it is a smart charger.
  • On a solid wall, or a post set in the ground for the purpose, rather than a fence panel.

When the best spot for the car is a long way from the board, the length of that route sets the cable size, so we look at the charger position and the route together.

08

Notification and paperwork

A chargepoint installation has to be notified to the network operator, the company that owns the cables in the street. Depending on the supply, some need the operator’s agreement before the charger is connected. We deal with that as part of the job.

A new circuit is notifiable under Part P, so building control is notified too, and you receive a Building Regulations compliance certificate along with the Electrical Installation Certificate for the circuit, with its test results. Keep both with the house paperwork.

Good to know

EV chargers
  • Photos first. The board, the meter and the drive tell us most of what we need before a visit.
  • The main fuse matters. Its rating sets how much the house and the charger can draw together.
  • Leave the cut-out alone. It belongs to the network operator. A photo is all we need.
  • An old board may need work first. The charger needs a spare way and RCD protection.
  • Smart chargers need a signal. Check your Wi-Fi reaches the spot, or that the charger can use mobile data.
  • Keep the paperwork. The certificate and the Building Regulations certificate go with the house.

Questions

EV chargers, asked and answered

Something else on your mind? Ask us.

Can I just charge from a three-pin socket?

For the odd top-up, with the lead made for it, yes. But an ordinary socket is not designed to carry a heavy load for hours, night after night. A chargepoint on its own circuit is faster, and it has the protection a car charger needs.

What is load management?

A sensor at the meter measures what the house is drawing, and the charger turns its own rate down while the house is busy. The house and the car together stay within the main fuse, and the car still charges overnight.

Does the network operator need to know?

Yes. A chargepoint installation has to be notified to the network operator, the company that owns the cables in the street. We deal with that as part of the job.

Tethered or untethered?

A tethered charger has its lead fixed on, so you just unhook it and plug in. An untethered one has a socket and you use your own lead, which is tidier on the wall but lives in the boot. Both charge the car in the same way.

How far from the consumer unit can the charger go?

There is no fixed limit. A longer run needs a thicker cable to keep the voltage drop down, and the route has to be practical: through the wall, along it, and in a duct where it crosses the drive. We measure it before we quote.

Registration and standards

  • Scheme NAPIT registered Registered electrical installer
  • Standard Work to BS 7671 The IET Wiring Regulations
  • Building Regulations Part P notified Notifiable work reported to building control

Get in touch

Send us a photo of the job.

A photo of the fuse board, the fault or the room, sent on WhatsApp, is often the quickest way to start. Or call, or use the enquiry form and we will come back to you.

  1. 01A photo of the fuse board, or of the problem
  2. 02Your postcode, so we know where the job is
  3. 03A sentence on what you would like done